top of page
projects
Project
Newert conducts bio-signal analysis, development services, and validation testing through its proprietary solutions.
Validation testing(or Usability Evaluation)
Research and Definition
of In-Cabin (Vehicle Interior) Components
Client
Corporate - MO*
Project Duration
2024. 09 -
Work Details
Literature Review and Expert Evaluation of Components
Conducting and Analyzing Surveys & Empirical Studies
Dataset Definition and Results Report
Validation testing(or Usability Evaluation)
Analysis of International Standards Trends
for Developing Mobility Simulation SaaS
Client
Corporate - MO*
Project Duration
2024. 09 -
Work Details
Research on International Standards for Autonomous Driving Technology Development
Data Analysis and Results Report
Development
Bluetooth (BLE) wearable healthcare device app development
Client
Government-funded Research Institute - *Technical Institute
Project Duration
2024. 06 -
Work Details
Development of a BLE wearable device for diagnosing vocal cord diseases
EGG, vocal cord frequency data linkage and collection
Development of raw data and analytical data visualization
Validation testing(or Usability Evaluation)
Empirical data analysis and infographics for usability evaluation based on e-mobility
Client
Corporate - Affect*
Project Duration
2023. 12 - 2024. 01
Work Details
Development of a verification scenario for empirical testing methods for performance improvement results
Conducting empirical tests based on scenarios for subjects (users) and analyzing the results
Derivation of test method standards (draft) through expert review
Validation testing(or Usability Evaluation)
Conducting a usability evaluation of a city digital twin app for SaaS functional design
Client
Corporate - MO*
Project Duration
2023. 11 - 2023. 11
Work Details
Conduct usability evaluations to improve app usability and completeness
Conducting online surveys and offline focus group interviews
Providing results reports using raw data-based analysis, data visualization, etc.
Development
Establishment of a smart factory MES system for the basic stage of the extraction vehicle
Client
Corporate - W*
Project Duration
2023. 10 - 2024. 02
Work Details
Building a Cloud-Based Basic MES System, Establishing baseline information, inventory, production, process, quality, and system management functions
Interface optimization according to device type (PC/Tablet/Mobile)
Development
Manufacturing Service Convergence Evidence Data Portal System Enhancement
Client
Government-funded Research Institute - *Technical Research Institute
Project Duration
2023. 09 - 2023. 12
Work Details
Improve existing web pages made with HTML and PHP
Building a virtualization infrastructure system utilizing server PCs
Building pages and features for managing virtual infrastructure systems
Analyze
Pain EMG data collection experimental environment consulting and data analysis
Client
Corporate - Ham*
Project Duration
2023. 08 - 2023. 11
Work Details
Pain EMG Measurement Procedure and Experimental Environment Consulting
Provide data analysis and results reports
bottom of page